Welcome to the Piano World Piano Forums
Over 2 million posts about pianos, digital pianos, and all types of keyboard instruments
Join the World's Largest Community of Piano Lovers (it's free)
It's Fun to Play the Piano ... Please Pass It On!

SEARCH
the Forums & Piano World

This custom search works much better than the built in one and allows searching older posts.
(ad 125) Sweetwater - Digital Keyboards & Other Gear
Digital Pianos at Sweetwater
(ad) Pearl River
Pearl River Pianos
(ad) Pianoteq
Latest Pianoteq add-on instrument: U4 upright piano
(ad) P B Guide
Acoustic & Digital Piano Guide
PianoSupplies.com (150)
Piano Accessories Music Related Gifts Piano Tuning Equipment Piano Moving Equipment
We now offer Gift Certificates in our online store!
(ad) Estonia Piano
Estonia Piano
Quick Links to Useful Stuff
Our Classified Ads
Find Piano Professionals-

*Piano Dealers - Piano Stores
*Piano Tuners
*Piano Teachers
*Piano Movers
*Piano Restorations
*Piano Manufacturers
*Organs

Quick Links:
*Advertise On Piano World
*Free Piano Newsletter
*Online Piano Recitals
*Piano Recitals Index
*Piano Accessories
* Buying a Piano
*Buying A Acoustic Piano
*Buying a Digital Piano
*Pianos for Sale
*Sell Your Piano
*How Old is My Piano?
*Piano Books
*Piano Art, Pictures, & Posters
*Directory/Site Map
*Contest
*Links
*Virtual Piano
*Music Word Search
*Piano Screen Saver
*Piano Videos
*Virtual Piano Chords
Topic Options
#654323 - 02/04/03 01:13 PM The Shuttle - Technical (OT)
Chris W1 Offline
500 Post Club Member

Registered: 09/26/01
Posts: 915
Loc: Boston
As we wait for a more thorough explaination to Saturday's events, I found this one of what happened to Challenger:

Launch:
January 28, 1986,11:38:00 a.m. EST. First Shuttle liftoff scheduled from Pad B. Launch set for 3:43 p.m. EST, Jan. 22, slipped to Jan. 23, then Jan. 24, due to delays in mission 61-C. Launch reset for Jan. 25 because of bad weather at transoceanic abort landing (TAL) site in Dakar, Senegal. To utilize Casablanca (not equipped for night landings) as alternate TAL site, T-zero moved to morning liftoff time. Launch postponed a day when launch processing unable to meet new morning liftoff time. Prediction of unacceptable weather at KSC led to launch rescheduled for 9:37 a.m. EST, Jan. 27. Launch delayed 24 hours again when ground servicing equipment hatch closing fixture could not be removed from orbiter hatch. Fixture sawed off and attaching bolt drilled out before closeout completed. During delay, cross winds exceeded return-to-launch-site limits at KSC's Shuttle Landing Facility. Launch Jan. 28 delayed two hours when hardware interface module in launch processing system, which monitors fire detection system, failed during liquid hydrogen tanking procedures.

Just after liftoff at .678 seconds into the flight, photographic data show a strong puff of gray smoke was spurting from the vicinity of the aft field joint on the right Solid Rocket Booster. Computer graphic analysis of film from pad cameras indicated the initial smoke came from the 270 to 310-degree sector of the circumference of the aft field joint of the right Solid Rocket Booster. This area of the solid booster faces the External Tank. The vaporized material streaming from the joint indicated there was not complete sealing action within the joint.

Eight more distinctive puffs of increasingly blacker smoke were recorded between .836 and 2.500 seconds. The smoke appeared to puff upwards from the joint. While each smoke puff was being left behind by the upward flight of the Shuttle, the next fresh puff could be seen near the level of the joint. The multiple smoke puffs in this sequence occurred at about four times per second, approximating the frequency of the structural load dynamics and resultant joint flexing. As the Shuttle increased its upward velocity, it flew past the emerging and expanding smoke puffs. The last smoke was seen above the field joint at 2.733 seconds.

The black color and dense composition of the smoke puffs suggest that the grease, joint insulation and rubber O-rings in the joint seal were being burned and eroded by the hot propellant gases.

At approximately 37 seconds, Challenger encountered the first of several high-altitude wind shear conditions, which lasted until about 64 seconds. The wind shear created forces on the vehicle with relatively large fluctuations. These were immediately sensed and countered by the guidance, navigation and control system. The steering system (thrust vector control) of the Solid Rocket Booster responded to all commands and wind shear effects. The wind shear caused the steering system to be more active than on any previous flight.

Both the Shuttle main engines and the solid rockets operated at reduced thrust approaching and passing through the area of maximum dynamic pressure of 720 pounds per square foot. Main engines had been throttled up to 104 percent thrust and the Solid Rocket Boosters were increasing their thrust when the first flickering flame appeared on the right Solid Rocket Booster in the area of the aft field joint. This first very small flame was detected on image enhanced film at 58.788 seconds into the flight. It appeared to originate at about 305 degrees around the booster circumference at or near the aft field joint.

One film frame later from the same camera, the flame was visible without image enhancement. It grew into a continuous, well-defined plume at 59.262 seconds. At about the same time (60 seconds), telemetry showed a pressure differential between the chamber pressures in the right and left boosters. The right booster chamber pressure was lower, confirming the growing leak in the area of the field joint.

As the flame plume increased in size, it was deflected rearward by the aerodynamic slipstream and circumferentially by the protruding structure of the upper ring attaching the booster to the External Tank. These deflections directed the flame plume onto the surface of the External Tank. This sequence of flame spreading is confirmed by analysis of the recovered wreckage. The growing flame also impinged on the strut attaching the Solid Rocket Booster to the External Tank.

The first visual indication that swirling flame from the right Solid Rocket Booster breached the External Tank was at 64.660 seconds when there was an abrupt change in the shape and color of the plume. This indicated that it was mixing with leaking hydrogen from the External Tank. Telemetered changes in the hydrogen tank pressurization confirmed the leak. Within 45 milliseconds of the breach of the External Tank, a bright sustained glow developed on the black-tiled underside of the Challenger between it and the External Tank.

Beginning at about 72 seconds, a series of events occurred extremely rapidly that terminated the flight. Telemetered data indicate a wide variety of flight system actions that support the visual evidence of the photos as the Shuttle struggled futilely against the forces that were destroying it.

At about 72.20 seconds the lower strut linking the Solid Rocket Booster and the External Tank was severed or pulled away from the weakened hydrogen tank permitting the right Solid Rocket Booster to rotate around the upper attachment strut. This rotation is indicated by divergent yaw and pitch rates between the left and right Solid Rocket Boosters.

At 73.124 seconds,. a circumferential white vapor pattern was observed blooming from the side of the External Tank bottom dome. This was the beginning of the structural failure of hydrogen tank that culminated in the entire aft dome dropping away. This released massive amounts of liquid hydrogen from the tank and created a sudden forward thrust of about 2.8 million pounds, pushing the hydrogen tank upward into the intertank structure. At about the same time, the rotating right Solid Rocket Booster impacted the intertank structure and the lower part of the liquid oxygen tank. These structures failed at 73.137 seconds as evidenced by the white vapors appearing in the intertank region.

Within milliseconds there was massive, almost explosive, burning of the hydrogen streaming from the failed tank bottom and liquid oxygen breach in the area of the intertank.

At this point in its trajectory, while traveling at a Mach number of 1.92 at an altitude of 46,000 feet, the Challenger was totally enveloped in the explosive burn. The Challenger's reaction control system ruptured and a hypergolic burn of its propellants occurred as it exited the oxygen-hydrogen flames. The reddish brown colors of the hypergolic fuel burn are visible on the edge of the main fireball. The Orbiter, under severe aerodynamic loads, broke into several large sections which emerged from the fireball. Separate sections that can be identified on film include the main engine/tail section with the engines still burning, one wing of the Orbiter, and the forward fuselage trailing a mass of umbilical lines pulled loose from the payload bay.

The Explosion 73 seconds after liftoff claimed crew and vehicle. Cause of explosion was determined to be an O-ring failure in right SRB. Cold weather was a contributing factor. Launch Weight: 268,829 lbs.

found at: http://science.ksc.nasa.gov/shuttle/missions/51-l/mission-51-l.html
_________________________
Amateur At Large

Top
(ad PTG 568) Win a Year Journal Subscription
PTG 57th Annual Convention - Atlanta
#654324 - 02/05/03 01:08 PM Re: The Shuttle - Technical (OT)
Brian Lawson, RPT Offline
500 Post Club Member

Registered: 07/04/01
Posts: 647
Loc: South Africa
Alan Shepard remarked that being in a rocket built by the cheapest tender was not very comforting!!
_________________________
Brian Lawson, RPT
Johannesburg
South Africa

http://www.lawsonic.co.za

Top

Moderator:  Piano World 
What's Hot!!
Our latest Issue is available now...
Piano News - Interesting & Fun Piano Related Newsletter! (free)
-------------------
HOW TO POST PICTURES on the Piano Forums
-------------------
Sharing is Caring!
About the Buttons
-------------------
Forums Rules & Help
-------------------
ADVERTISE
on Piano World

The world's most popular piano web site.
(ad) HAILUN Pianos
Hailun Pianos - Click for More
Ad (Seiler/Knabe)
Seiler Pianos
Sheet Music
(PW is an affiliate)
Sheet Music Plus Featured Sale
(125ad) Dampp Chaser
Dampp Chaser Piano Life Saver
(ad) Lindeblad Piano
Lindeblad Piano Restoration
Who's Online
133 registered (Alexander Borro, Abby Pianoman, 36251, ando, accordeur, 38 invisible), 1882 Guests and 22 Spiders online.
Key: Admin, Global Mod, Mod
Forum Stats
75596 Members
42 Forums
156303 Topics
2295574 Posts

Max Online: 15252 @ 03/21/10 11:39 PM
New Topics - Multiple Forums
P80 for 150
by LarryShone
07/31/14 11:26 AM
Happy Birthday torquenale !!!!
by CarlosCC
07/31/14 08:26 AM
compositional methods
by Michael Sayers
07/31/14 08:03 AM
Happy Birthday earlofmar !!!!
by CarlosCC
07/31/14 04:49 AM
Tight Key ??
by moy71
07/31/14 01:15 AM
(ads by Google)

Visit our online store for gifts for music lovers

 
Our Piano Related Classified Ads
| Dealers | Tuners | Lessons | Movers | Restorations | Pianos For Sale | Sell Your Piano |

Advertise on Piano World
| Subscribe | Piano World | PianoSupplies.com | Advertise on Piano World | Donate | Link to Us | Classifieds |
| |Contact | Privacy | Legal | About Us | Site Map | Free Newsletter | Press Room |


copyright 1997 - 2014 Piano World ® all rights reserved
No part of this site may be reproduced without prior written permission